Hotels
Hotel Lounge Renovation Planning for Hotels
Survey existing services and finishes before committing to a demolition or reuse plan. Identify what can stay and where hidden work may surface.
Explore the ideas
Walkthrough checklist
- Record existing walls, openings, services and damage, then verify uncertain items with the appropriate trade.
- Separate required repairs from optional replacements so quotes show where the budget goes.
- Agree which access, isolation, removal and protection steps are needed before work starts.
Worked example
Removing a partition between dining and living rooms may expose old flooring and leave switches on a wall that disappears.
Survey floor continuity, wall construction, and electrical routes before fixing the new layout. Mark retained finishes and ask the relevant trades to price repair and service changes separately.
How to test it
Walk through the marked-up plan with the installer and record conditions that would change scope or cost.
Apply it to this space
- Layout
- Create distinct seating clusters with a clear route between reception, lifts, and food service.
- Detail
- Mix upright and relaxed seating, with local reading lights and durable upholstery.
- Trade-off
- More lounge seating improves availability but makes the lobby feel crowded.
- Check each seat has a clear approach
- Listen for overlap between nearby groups

The Elixir portfolio
Details worth a closer look

