Multigenerational homes
Shared bathroom Renovation Planning for Multigenerational homes
Survey existing services and finishes before committing to a demolition or reuse plan. Identify what can stay and where hidden work may surface.
Explore the ideas
Walkthrough checklist
- Record existing walls, openings, services and damage, then verify uncertain items with the appropriate trade.
- Separate required repairs from optional replacements so quotes show where the budget goes.
- Agree which access, isolation, removal and protection steps are needed before work starts.
Worked example
Replacing a bath with a shower may require moving a drain whose route is hidden below the floor.
Verify the existing drain and floor build-up with the relevant trade before selecting the shower tray or committing to demolition.
How to test it
Walk through the marked-up plan with the installer and record conditions that would change scope or cost.
Apply it to this space
- Layout
- If the plan allows, separate vanity access from the toilet and shower zone.
- Detail
- Use durable finishes, reachable towel storage and clear personal-item compartments.
- Trade-off
- A split arrangement eases simultaneous use but takes more wall and plumbing planning.
- Walk through peak-hour routines
- Check privacy and storage for each user

The Elixir portfolio
Details worth a closer look