Rental homes
Bathroom Renovation Planning for Rental homes
Survey existing services and finishes before committing to a demolition or reuse plan. Identify what can stay and where hidden work may surface.
Explore the ideas
Walkthrough checklist
- Record existing walls, openings, services and damage, then verify uncertain items with the appropriate trade.
- Separate required repairs from optional replacements so quotes show where the budget goes.
- Agree which access, isolation, removal and protection steps are needed before work starts.
Worked example
Replacing a bath with a shower may require moving a drain whose route is hidden below the floor.
Verify the existing drain and floor build-up with the relevant trade before selecting the shower tray or committing to demolition.
How to test it
Walk through the marked-up plan with the installer and record conditions that would change scope or cost.
Apply it to this space
- Layout
- Use freestanding or tension-fit organizers that do not obstruct taps, shower or cleaning.
- Detail
- Choose quick-dry textiles and non-marking hooks subject to the lease terms.
- Trade-off
- Over-door organizers add capacity but may interfere with door or towel use.
- Check hooks and organizers do not damage surfaces
- Observe water and ventilation after use

The Elixir portfolio
Details worth a closer look

