Showrooms
Demonstration Area Renovation Planning for Showrooms
Survey existing services and finishes before committing to a demolition or reuse plan. Identify what can stay and where hidden work may surface.
Explore the ideas
Walkthrough checklist
- Record existing walls, openings, services and damage, then verify uncertain items with the appropriate trade.
- Separate required repairs from optional replacements so quotes show where the budget goes.
- Agree which access, isolation, removal and protection steps are needed before work starts.
Worked example
Removing a partition between dining and living rooms may expose old flooring and leave switches on a wall that disappears.
Survey floor continuity, wall construction, and electrical routes before fixing the new layout. Mark retained finishes and ask the relevant trades to price repair and service changes separately.
How to test it
Walk through the marked-up plan with the installer and record conditions that would change scope or cost.
Apply it to this space
- Layout
- Face a small audience zone toward the demo surface and keep a staff-only preparation edge behind it.
- Detail
- Choose easy-clean flooring and layered lighting so the product remains visible during operation.
- Trade-off
- A dedicated demo area can sit unused between scheduled sessions.
- Gather a small audience and test sightlines
- Check power and water connections remain protected

The Elixir portfolio
Details worth a closer look

