Villas
Kitchen Renovation Planning for Villas
Survey existing services and finishes before committing to a demolition or reuse plan. Identify what can stay and where hidden work may surface.
Explore the ideas
Walkthrough checklist
- Record existing walls, openings, services and damage, then verify uncertain items with the appropriate trade.
- Separate required repairs from optional replacements so quotes show where the budget goes.
- Agree which access, isolation, removal and protection steps are needed before work starts.
Worked example
During a kitchen refresh, the proposed sink move depends on an unverified drain route.
Have the relevant trade inspect the route before fixing cabinet drawings; price a reuse-the-existing-point option alongside the move.
How to test it
Walk through the marked-up plan with the installer and record conditions that would change scope or cost.
Apply it to this space
- Layout
- Separate the heavy cooking run from a breakfast counter and provide a short route to dining and patio.
- Detail
- Use task lighting at prep zones and durable finishes where garden traffic enters.
- Trade-off
- A large island creates gathering space but may lengthen the cook’s work route.
- Walk the prep-to-dining route
- Check sun and heat at counters

The Elixir portfolio
Details worth a closer look

