Chromepet · Home Renovation Interior Designers
Home Renovation Interior Designers in Chromepet
Many Chromepet homes, especially independent houses on the older residential streets, were built well before modular interiors were common. Renovating one usually starts with replacing a tired cement-platform kitchen and continues room by room, and Elixir's renovation designers plan that sequence only after checking what the walls, wiring and terrace can support.
Typical budget
2BHK in Chromepet
- Popular hereBasic₹2.1L – ₹3.9L
≈ ₹230/sq ft – ₹430/sq ft
- Premium₹2.5L – ₹4.7L
≈ ₹280/sq ft – ₹520/sq ft
- Ultra Premium₹2.9L – ₹5.5L
≈ ₹320/sq ft – ₹600/sq ft
Estimates only, pre-GST and subject to change. Every price on this page comes from the same rate card as our calculator (updated 28 October 2026), so they all update together. Your designer confirms the final figure after a free site visit.
Quick answer
Elixir's renovation designers in Chromepet help owners of older flats and independent houses upgrade their interiors after a proper site audit, frequently beginning with a worn civil kitchen. For a typical 2BHK, interior work is approximately ₹2.1L – ₹3.9L in Basic to ₹2.9L – ₹5.5L in Ultra Premium, pre-GST, with demolition and repairs quoted separately after inspection. The first consultation is free.
Our approach
How we handle home renovation interior projects
What we plan for
- Site audit before design
- Reuse versus replace decisions
- Civil, electrical, and plumbing coordination
- Phased execution for occupied homes
What drives the cost
- Demolition and repair scope
- Condition of existing services
- Custom carpentry replacement
- Flooring, ceiling, and wall finish changes
Materials we recommend
- Inspect moisture damage before cabinet planning
- Upgrade electrical points before final carpentry
- Choose repairable finishes for older homes
- Confirm wall levels before paneling or tall storage
Mistakes to avoid
- Quoting renovation without a site audit
- Hiding old service issues behind new finishes
- Changing design after demolition begins
- Underestimating dust control and family disruption
GST Road & southern suburbs · PIN 600044
Planning interiors in Chromepet
A busy GST Road suburb with dense residential streets, independent homes and many mid-sized apartment buildings.
- Older independent houses in Chromepet commonly have civil kitchens with cement platforms and open shelving, and replacing these is the usual first renovation step.
- Wiring in houses of that age was rarely planned for split ACs, chimneys or induction hobs, so new points are mapped before any carpentry is drawn.
- Families renovating here tend to stay in the house, so work moves floor by floor or room by room with dust barriers and a working kitchen kept for as long as possible.
- Top-floor rooms under older terraces can show seepage after the monsoon, and that has to be repaired and dried before new wardrobes go against those walls.
Our work
Homes we've designed near Chromepet
Real Elixir homes in Chennai. Every project is measured, designed, produced and installed by our team.
Velachery Chennai · 1250 sq ft · 8 weeks
Nungambakkam Chennai · 1800 sq ft · 6 weeks
T Nagar Chennai · 1200 sq ft · 6 weeks
Talk to a real designer
Numbers are a starting point. A designer gets you the real one.
Every home is different. A 20-minute conversation with one of our designers usually narrows the range a lot, and often finds savings you wouldn't spot on your own. It's free and there's no obligation.
Before & after
A better version of your home
Drag the slider to see what a well-planned interior does to the same room. Premium finishes and smart storage, planned around how you live.


Try it yourself
Estimate your own home
Adjust the home size, package and scope. Numbers update instantly using the same rate card as this page.
Use the carpet area from your sale agreement, not super built-up.
Your approximate estimate
₹2.1L – ₹3.9L
≈ ₹230/sq ft – ₹430/sq ft of carpet area · pre-GST
- Living room₹23K – ₹43K
- Modular kitchen₹50K – ₹93K
- Bedroom (wardrobe, bed, side units) × 2₹1.1L – ₹2L
- Bathroom vanity & storage × 2₹9K – ₹17K
- Dining & crockery₹19K – ₹35K
A rough guide only. Layout, finishes, hardware and site conditions can move the final number in either direction, and a designer can usually find ways to fit your budget.
Plan smarter
Five ways to keep your budget on track
- 01
Book one thorough audit visit
Chromepet is about 40 minutes from the studio, so ask for a single detailed audit that covers walls, wiring, plumbing and the terrace together.
- 02
Sequence the kitchen first
If you are phasing, a new kitchen usually brings the biggest daily improvement. Plan the later rooms on paper at the same time.
- 03
Repair before you build
Treat seepage, finish rewiring and let plaster cure fully before modular units arrive, so new boards are not exposed to moisture.
- 04
Freeze the design before breaking anything
Approve layouts and finishes before demolition starts. Changes after walls are opened add both cost and delay.
- 05
Agree on living arrangements
Decide where the family will cook and sleep during each phase, and how dust and noise will be contained for children and elders.
Happy homes
2,500+ Chennai families have moved in with Elixir
Since 2013, we've designed and built homes across Chennai, backed by a 12-year woodwork warranty and after-care from the same team.
Priya & Arvind
4BHK in Anna Nagar, Chennai.
"Small space, big impact. Every corner feels intentional. It's deeply personal."
Materials & hardware partners
FAQ
Questions homeowners ask
Still unsure? Our designers are happy to answer anything on a call.
Can I renovate my Chromepet house one room at a time?
Yes. Phased renovation is very common here, often starting with the kitchen. The designer plans the whole house first so later rooms match the earlier ones in finish and style.
Is it worth replacing an old cement-platform kitchen?
Usually, yes, if the platform is cracked, uneven or at an uncomfortable height. A modular kitchen improves storage and hygiene, though a sound platform can sometimes be kept with new cabinets below.
Does Elixir handle the electrical upgrades as well?
Elixir coordinates the electrical changes needed for the interior scope, such as new points for the chimney and ACs. The extent of work is agreed after the site audit.
How is renovation priced differently from new interiors?
Carpentry is priced much like new work, but demolition, repairs and service upgrades are added on top. Those depend entirely on the house and are quoted after inspection.
How long does a renovation take?
It depends on how much repair and civil work is needed. Once that is done and the design is approved, factory production typically takes 15–20 working days before installation.
Keep exploring
Related guides
Get a number you can actually plan with
Online estimates are a starting point. Our designers visit, measure and give you an itemised quote, usually within a week.






