Medavakkam · Home Renovation Interior Designers
Home Renovation Interior Designers in Medavakkam
Renovating in Medavakkam often means dealing with homes built when the area was still developing, including independent houses with concrete lofts, older wiring and walls that have seen a few monsoons of waterlogging. Our renovation designers begin with what is behind the walls and under the floor, because problems found after carpentry starts are the most expensive kind.
Typical budget
2BHK in Medavakkam
- Popular hereBasic₹2.1L – ₹3.9L
≈ ₹220/sq ft – ₹410/sq ft
- Premium₹2.5L – ₹4.7L
≈ ₹260/sq ft – ₹490/sq ft
- Ultra Premium₹2.9L – ₹5.5L
≈ ₹310/sq ft – ₹570/sq ft
Estimates only, pre-GST and subject to change. Every price on this page comes from the same rate card as our calculator (updated 28 October 2026), so they all update together. Your designer confirms the final figure after a free site visit.
Quick answer
Elixir's home renovation interior designers in Medavakkam help owners of older apartments and independent houses upgrade without losing control of scope, starting with a site audit. For reference, a typical 2BHK interior costs approximately ₹2.1L – ₹3.9L in Basic, pre-GST, before any repair work. Book a free consultation to plan your renovation.
Our approach
How we handle home renovation interior projects
What we plan for
- Site audit before design
- Reuse versus replace decisions
- Civil, electrical, and plumbing coordination
- Phased execution for occupied homes
What drives the cost
- Demolition and repair scope
- Condition of existing services
- Custom carpentry replacement
- Flooring, ceiling, and wall finish changes
Materials we recommend
- Inspect moisture damage before cabinet planning
- Upgrade electrical points before final carpentry
- Choose repairable finishes for older homes
- Confirm wall levels before paneling or tall storage
Mistakes to avoid
- Quoting renovation without a site audit
- Hiding old service issues behind new finishes
- Changing design after demolition begins
- Underestimating dust control and family disruption
South Chennai · PIN 600100
Planning interiors in Medavakkam
A fast-growing residential junction connecting Velachery, Tambaram and OMR, with plenty of new apartments and independent homes.
- Older independent houses here often have concrete shelves, lofts and civil kitchens, and deciding which to keep or remove is a key early decision in renovation planning.
- Homes in waterlogging-prone pockets may have dampness at the base of walls, which must be treated before new wardrobes or kitchen cabinets are fitted.
- Electrical systems in older buildings may not support modern appliances and air conditioners, so rewiring is often part of the renovation scope.
- Many renovation clients in Medavakkam continue living in the home during work, which calls for phased execution and dust control.
Our work
Homes we've designed near Medavakkam
Real Elixir homes in Chennai. Every project is measured, designed, produced and installed by our team.
Velachery Chennai · 1250 sq ft · 8 weeks
Adyar Chennai · 1620 sq ft · 5 weeks
OMR Chennai · 1100 sq ft · 8 weeks
Talk to a real designer
Numbers are a starting point. A designer gets you the real one.
Every home is different. A 20-minute conversation with one of our designers usually narrows the range a lot, and often finds savings you wouldn't spot on your own. It's free and there's no obligation.
Before & after
A better version of your home
Drag the slider to see what a well-planned interior does to the same room. Premium finishes and smart storage, planned around how you live.


Try it yourself
Estimate your own home
Adjust the home size, package and scope. Numbers update instantly using the same rate card as this page.
Use the carpet area from your sale agreement, not super built-up.
Your approximate estimate
₹2.1L – ₹3.9L
≈ ₹220/sq ft – ₹410/sq ft of carpet area · pre-GST
- Living room₹23K – ₹43K
- Modular kitchen₹50K – ₹93K
- Bedroom (wardrobe, bed, side units) × 2₹1.1L – ₹2L
- Bathroom vanity & storage × 2₹9K – ₹17K
- Dining & crockery₹19K – ₹35K
A rough guide only. Layout, finishes, hardware and site conditions can move the final number in either direction, and a designer can usually find ways to fit your budget.
Plan smarter
Five ways to keep your budget on track
- 01
Start with a site audit
Never accept a renovation quote without a site visit. Hidden issues such as damp, weak wiring or plumbing leaks change the scope significantly.
- 02
Decide reuse versus replace
Some existing furniture or concrete lofts may be worth keeping. Decide early so the design and budget reflect it.
- 03
Fix services before carpentry
Upgrade electrical points and repair plumbing before installing new cabinets. Reopening finished carpentry is costly.
- 04
Do not change plans mid-demolition
Finalise the design before demolition begins. Changes once work has started cause delays and extra expense.
- 05
Plan for dust and disruption
If you are living in the home, discuss phasing and dust control. Working room by room reduces disruption to the family.
Happy homes
2,500+ Chennai families have moved in with Elixir
Since 2013, we've designed and built homes across Chennai, backed by a 12-year woodwork warranty and after-care from the same team.
Priya & Arvind
4BHK in Anna Nagar, Chennai.
"Small space, big impact. Every corner feels intentional. It's deeply personal."
Materials & hardware partners
FAQ
Questions homeowners ask
Still unsure? Our designers are happy to answer anything on a call.
Why is a site audit important before renovation?
It reveals hidden issues like dampness, old wiring or plumbing leaks. Without it, the quote may miss significant work that only becomes visible once demolition starts.
Can I renovate while living in my house?
Yes, with phased execution. We plan work room by room and take steps to control dust, though some disruption is unavoidable.
Should I remove my old concrete lofts?
Not always. Sound concrete lofts can be fitted with new shutters to save money. If they are cracked or damp, replacing them may be better.
How do you handle dampness in older walls?
Damp walls need treatment before carpentry. The designer will inspect the walls and recommend appropriate repair before installing wardrobes or cabinets.
Does renovation take longer than new interiors?
Usually yes, because of demolition, repairs and service upgrades. Production typically takes 15–20 working days after design sign-off, but site preparation adds time beforehand.
Keep exploring
Related guides
Get a number you can actually plan with
Online estimates are a starting point. Our designers visit, measure and give you an itemised quote, usually within a week.






