RKN Construction Pvt. Ltd.
Interior cost for Sri Krishna Flats
Sri Krishna Flats is an under-construction, 20-home building of a stilt floor and five floors by RKN Construction Pvt. Ltd., registered with TN RERA in January 2024 as TN/35/Building/007/2024, with a filed completion date of September 2028. Buyers here have time to plan budgets now and start design a few months before keys.
- 2,500+ homes since 2013
- Rates updated
Approximate cost
2BHK in Sri Krishna Flats, ~845 sq ft
- Basic₹11.2L – ₹12.5L
≈ ₹1330/sq ft – ₹1480/sq ft
- Premium₹18L – ₹20L
≈ ₹2130/sq ft – ₹2370/sq ft
- Ultra Premium₹27L – ₹30L
≈ ₹3200/sq ft – ₹3550/sq ft
Estimates only, pre-GST and subject to change. Every price on this page comes from the same rate card as our calculator (updated 17 November 2026), so they all update together. Your designer confirms the final figure after a free site visit.
Quick answer
With a September 2028 completion on file, a 2BHK of about 845 sq ft at Sri Krishna Flats would typically need around ₹11.2L – ₹12.5L for Basic interiors, ₹18L – ₹20L for Premium and ₹27L – ₹30L for Ultra Premium at current rates, pre-GST. Sizes are district estimates, so revisit the figures with a designer nearer handover.
At a glance
Sri Krishna Flats: approximate full-home cost by configuration
Estimates from our calculator rate card: pre-GST and subject to change. Tap a row to open that guide.
| Configuration | Basic | Premium | Ultra Premium |
|---|---|---|---|
| 2BHK · 760–930 sq ft | ₹11.2L – ₹12.5L | ₹18L – ₹20L | ₹27L – ₹30L |
| 3BHK · 1070–1310 sq ft | ₹13.5L – ₹15L | ₹22.5L – ₹25L | ₹36L – ₹40L |
RKN Construction Pvt. Ltd.
Sri Krishna Flats at a glance
Facts from the project's registry filing and published configurations. Estimates on this page are based on them.
- TN RERA
- TN/35/Building/007/2024
- Homes
- 20 · stilt + 5 floors
- Completion (RERA)
- Sep 2028
- Area basis
- Typical for the district
Sources:verified.realestate
Try it yourself
Estimate your own home
Adjust the home size, package and scope. Numbers update instantly using the same rate card as this page.
Use the carpet area from your sale agreement, not super built-up.
Your approximate estimate
₹18L – ₹20L
≈ ₹2130/sq ft – ₹2370/sq ft of carpet area · pre-GST
- Living room₹2.1L – ₹2.4L
- Modular kitchen₹4L – ₹4.5L
- Bedroom (wardrobe, bed, side units) × 2₹7.6L – ₹8.5L
- Bathroom vanity & storage × 2₹2.7L – ₹3L
- Dining & crockery₹1.4L – ₹1.6L
A rough guide only. Layout, finishes, hardware and site conditions can move the final number in either direction, and a designer can usually find ways to fit your budget.
Talk to a real designer
Numbers are a starting point. A designer gets you the real one.
Every home is different. A 20-minute conversation with one of our designers usually narrows the range a lot, and often finds savings you wouldn't spot on your own. It's free and there's no obligation.
How we arrive at these numbers
Good to know
How we arrive at these numbers
The filed completion date is September 2028, so interior design is best started two to three months before handover, letting production run in parallel.
With 20 homes, many owners may start interiors soon after handover, so lift slots and delivery times could be in demand.
Before handover, ask the builder whether minor changes to electrical points are allowed, so sockets match your planned furniture.
Sizes here are district-typical, not published carpet areas; the builder's final floor plan will set the exact figures.
Our work
Homes we've designed in Chennai
Real Elixir homes in Chennai. Every project is measured, designed, produced and installed by our team.
2BHK in Anna Nagar ChennaiAnna Nagar Chennai · 1450 sq ft · 6 weeks
2BHK Apartment in Adyar ChennaiAdyar Chennai · 1620 sq ft · 5 weeks
Work from Home 2BHK in Perungudi ChennaiPerungudi Chennai · 1100 sq ft · 7 weeks
Detailed scope and cost breakdown
Where the money goes
Room-by-room breakdown
For: 2BHK in Sri Krishna Flats, ~845 sq ft. Bedrooms include wardrobes, a bed and side units; kitchens include base, wall and tall units with hardware.
Share of a Premium budget.
| Room | Basic | Premium | Ultra Premium |
|---|---|---|---|
| Living room | ₹1.6L – ₹1.8L | ₹2.1L – ₹2.4L | ₹3.2L – ₹3.6L |
| Modular kitchen | ₹2.7L – ₹3L | ₹4L – ₹4.5L | ₹5.4L – ₹6L |
| Bedroom (wardrobe, bed, side units)× 2 | ₹4.9L – ₹5.5L | ₹7.6L – ₹8.5L | ₹10.8L – ₹12L |
| Bathroom vanity & storage× 2 | ₹90K – ₹1L | ₹2.7L – ₹3L | ₹5.4L – ₹6L |
| Dining & crockery | ₹1.1L – ₹1.2L | ₹1.4L – ₹1.6L | ₹2.1L – ₹2.4L |
| Total (approx.) | ₹11.2L – ₹12.5L | ₹18L – ₹20L | ₹27L – ₹30L |
Estimates cover design, modular carpentry, installation and a 12-year woodwork warranty. Civil, electrical, painting, appliances and countertops are usually quoted separately. See full inclusions & specifications
More planning guidance
Before & after
A better version of your home
Drag the slider to see what a well-planned interior does to the same room. Premium finishes and smart storage, planned around how you live.


Plan smarter
Five ways to keep your budget on track
- 01
Plan the budget now
Use today's ranges to plan savings or a loan, then refine once the final floor plan and handover date are confirmed.
- 02
Request electrical changes early
Ask the builder in writing about moving or adding points before walls are finished. It is cheaper than changing them later.
- 03
Start design before handover
Begin two to three months before keys so production can run in parallel and installation starts soon after.
- 04
Book lift slots with the association
With 20 homes, early booking avoids queues when several owners start interiors together.
- 05
Wait for the final floor plan
District-typical sizes are a guide. The builder's floor plan gives exact dimensions to quote against.
Happy homes
2,500+ Chennai families have moved in with Elixir
Since 2013, we've designed and built homes across Chennai, backed by a 12-year woodwork warranty and after-care from the same team.
Priya & Arvind
4BHK in Anna Nagar, Chennai.
"Small space, big impact. Every corner feels intentional. It's deeply personal."
Materials & hardware partners
FAQ
Common cost questions
Still unsure? Our designers are happy to answer anything on a call.
When should we start interiors for a 2028 handover?
Begin design about two to three months before handover. Factory production can then run in parallel, so installation starts soon after you get keys.
Will today's prices hold until handover?
Not necessarily. Material and labour costs can change, so today's range of around ₹11.2L – ₹12.5L for Basic is a planning guide.
Can we ask the builder to change electrical points?
Many builders allow small changes if asked early. Request them in writing and share your planned furniture layout.
Who is building Sri Krishna Flats?
The project is registered with TN RERA by RKN Construction Pvt. Ltd. under TN/35/Building/007/2024. They are the contact for construction updates.
What does a 3BHK cost here?
For the typical 3BHK band, Basic usually runs around ₹13.5L – ₹15L and Premium about ₹22.5L – ₹25L before GST.
Is GST included in these Sri Krishna Flats interior estimates?
No. The ranges shown are indicative pre-tax figures. GST is applied as per prevailing government regulations at the time of payment and is shown separately on your formal quotation.
Keep exploring
Related guides
Get a number you can actually plan with
Online estimates are a starting point. Our designers visit, measure and give you an itemised quote, usually within a week.
