Navin Housing& Properties Pvt. Ltd.
Interior cost for Starwood Towers
Starwood Towers by Navin Housing & Properties is a 606-home project registered as TN/01/Building/0245/2022, with a filed completion date of January 2027. Handover is only weeks away, so owners who begin designing now can have production running in parallel and avoid the queues that build up once hundreds of families start fitting out at once.
- 2,500+ homes since 2013
- Rates updated
Approximate cost
3BHK in Starwood Towers, ~1315 sq ft
- Basic₹13.5L – ₹15L
≈ ₹1030/sq ft – ₹1140/sq ft
- Premium₹22.5L – ₹25L
≈ ₹1710/sq ft – ₹1900/sq ft
- Ultra Premium₹36L – ₹40L
≈ ₹2740/sq ft – ₹3040/sq ft
Estimates only, pre-GST and subject to change. Every price on this page comes from the same rate card as our calculator (updated 17 November 2026), so they all update together. Your designer confirms the final figure after a free site visit.
Quick answer
Starwood Towers is a large 3BHK project, and a full interior there typically costs around ₹13.5L – ₹15L in Basic, roughly ₹22.5L – ₹25L in Premium and about ₹36L – ₹40L in Ultra Premium, before GST. Sizes are estimated from the filing, and handover is filed for January 2027, so share your unit plan with a designer soon.
At a glance
Starwood Towers: approximate full-home cost by configuration
Estimates from our calculator rate card: pre-GST and subject to change. Tap a row to open that guide.
| Configuration | Basic | Premium | Ultra Premium |
|---|---|---|---|
| 3BHK · 1180–1450 sq ft | ₹13.5L – ₹15L | ₹22.5L – ₹25L | ₹36L – ₹40L |
Navin Housing& Properties Pvt. Ltd.
Starwood Towers at a glance
Facts from the project's registry filing and published configurations. Estimates on this page are based on them.
- TN RERA
- TN/01/Building/0245/2022
- Homes
- 606
- Completion (RERA)
- Jan 2027
- Area basis
- Average from RERA floor area
Sources:verified.realestate
Try it yourself
Estimate your own home
Adjust the home size, package and scope. Numbers update instantly using the same rate card as this page.
Use the carpet area from your sale agreement, not super built-up.
Your approximate estimate
₹22.5L – ₹25L
≈ ₹1710/sq ft – ₹1900/sq ft of carpet area · pre-GST
- Living room₹2.4L – ₹2.7L
- Modular kitchen₹4.5L – ₹5L
- Bedroom (wardrobe, bed, side units) × 3₹11.2L – ₹12.5L
- Bathroom vanity & storage × 3₹2.7L – ₹3L
- Dining & crockery₹1.6L – ₹1.8L
A rough guide only. Layout, finishes, hardware and site conditions can move the final number in either direction, and a designer can usually find ways to fit your budget.
Talk to a real designer
Numbers are a starting point. A designer gets you the real one.
Every home is different. A 20-minute conversation with one of our designers usually narrows the range a lot, and often finds savings you wouldn't spot on your own. It's free and there's no obligation.
How we arrive at these numbers
Good to know
How we arrive at these numbers
With 606 homes, handovers are typically staggered by tower, and lift and loading slots fill quickly in the first months, so booking installation dates early is important.
The project lists 3BHK homes, estimated at roughly 1180 to 1450 sq ft; the actual carpet area from your sale agreement should drive the final quote.
Large communities usually issue move-in rules covering work hours, material storage and debris removal, and we plan deliveries to fit those rules.
A filed completion date of January 2027 means detailed design ideally starts now, so woodwork is ready to install soon after you receive your keys.
Our work
Homes we've designed in Chennai
Real Elixir homes in Chennai. Every project is measured, designed, produced and installed by our team.
Renovated 3BHK in Velachery ChennaiVelachery Chennai · 1250 sq ft · 8 weeks
3BHK Flat in Nungambakkam ChennaiNungambakkam Chennai · 1800 sq ft · 6 weeks
2BHK Apartment in Adyar ChennaiAdyar Chennai · 1620 sq ft · 5 weeks
Detailed scope and cost breakdown
Where the money goes
Room-by-room breakdown
For: 3BHK in Starwood Towers, ~1315 sq ft. Bedrooms include wardrobes, a bed and side units; kitchens include base, wall and tall units with hardware.
Share of a Premium budget.
| Room | Basic | Premium | Ultra Premium |
|---|---|---|---|
| Living room | ₹1.6L – ₹1.8L | ₹2.4L – ₹2.7L | ₹3.7L – ₹4.2L |
| Modular kitchen | ₹3.1L – ₹3.5L | ₹4.5L – ₹5L | ₹7.2L – ₹8L |
| Bedroom (wardrobe, bed, side units)× 3 | ₹6.3L – ₹7L | ₹11.2L – ₹12.5L | ₹17.1L – ₹19L |
| Bathroom vanity & storage× 3 | ₹1.4L – ₹1.5L | ₹2.7L – ₹3L | ₹5.4L – ₹6L |
| Dining & crockery | ₹1.1L – ₹1.2L | ₹1.6L – ₹1.8L | ₹2.5L – ₹2.8L |
| Total (approx.) | ₹13.5L – ₹15L | ₹22.5L – ₹25L | ₹36L – ₹40L |
Estimates cover design, modular carpentry, installation and a 12-year woodwork warranty. Civil, electrical, painting, appliances and countertops are usually quoted separately. See full inclusions & specifications
More planning guidance
Before & after
A better version of your home
Drag the slider to see what a well-planned interior does to the same room. Premium finishes and smart storage, planned around how you live.


Plan smarter
Five ways to keep your budget on track
- 01
Book your installation slot early
In a 606-home project, lift and loading bays are in demand right after handover. Securing dates with the facility team early prevents long waits.
- 02
Read the move-in guidelines
Ask the builder or association for the fit-out rules: working hours, where materials can be stored and how debris must be cleared.
- 03
Use the third bedroom flexibly
A 3BHK gives room for a guest room or study. A sofa-cum-bed with storage and a desk keeps it useful every day, not just when visitors stay.
- 04
Measure the actual flat before production
Sizes on this page are estimates. Once you have access, we measure your unit so carpentry fits precisely rather than relying on brochure drawings.
- 05
Plan electrical changes with the design
Extra sockets or relocated light points are easier to add before carpentry. Finalise them during design so electricians and carpenters work in sequence.
Happy homes
2,500+ Chennai families have moved in with Elixir
Since 2013, we've designed and built homes across Chennai, backed by a 12-year woodwork warranty and after-care from the same team.
Priya & Arvind
4BHK in Anna Nagar, Chennai.
"Small space, big impact. Every corner feels intentional. It's deeply personal."
Materials & hardware partners
FAQ
Common cost questions
Still unsure? Our designers are happy to answer anything on a call.
Handover is filed for January 2027. When should we start designing?
Now is a good time. Starting design two to three months before handover lets production run in parallel, so installation can begin soon after you get possession.
What does a Premium 3BHK interior cost here?
Roughly ₹22.5L – ₹25L before GST for the full home. Premium covers better finishes, quality hardware and more lighting detail. Your carpet area and choices decide the final number.
Will lift availability slow down our installation?
In large projects, lifts can be busy in the first months. We book slots in advance with the facility team and plan deliveries to avoid long waits.
Can we store materials in our flat before installation?
Usually yes, once you have possession, though some projects have rules on storage in common areas. We deliver in planned batches to keep the flat workable.
Is a Basic package enough for a 3BHK?
For many owners it is. Basic, at around ₹13.5L – ₹15L before GST, covers essential kitchen, wardrobe and living room carpentry. You can upgrade specific rooms to Premium if you prefer.
Is GST included in these Starwood Towers interior estimates?
No. The ranges shown are indicative pre-tax figures. GST is applied as per prevailing government regulations at the time of payment and is shown separately on your formal quotation.
Keep exploring
Related guides
Get a number you can actually plan with
Online estimates are a starting point. Our designers visit, measure and give you an itemised quote, usually within a week.
